My “haven’t bathed in weeks” hair!
26 Jul 2011
Cyrus and I were dumping gravel between the casing (pvc pipe) and the wall of the borehole to serve as the filter material
Cyrus and I were dumping gravel between the casing (pvc pipe) and the wall of the borehole to serve as the filter material
day after day of drilling, all we pulled out was sticky clay
I was teaching the Dinka guys how important it is to keep the drill straight
Drilling on the first day