Rise and Shine!
The sunrise during our last morning in the village
The sunrise during our last morning in the village
First bit of water coming out of our well!
Cyrus and I were dumping gravel between the casing (pvc pipe) and the wall of the borehole to serve as the filter material
day after day of drilling, all we pulled out was sticky clay
I was teaching the Dinka guys how important it is to keep the drill straight
Drilling on the first day
Although we explained over and over, the men didn’t want to detach the extensions every 9’…rather they pulled the drill out as high as possible before the whole thing would start tipping
We traveled around the village teaching our hosts how to pick appropriate locations for the wells. The village was larger then I had expected and had a trench system along each street that brought water from a large canal into the village. The water was all runoff water so it is grossly contaminated. It was … More Final words on Tajikistan
One of the tasks I was really insecure about was constructing a pump. Hydromissions constructs a bailer bucket but not always a pump since they are much more difficult to produce with the limited materials typically available in villages. I was sort of hoping we would not have to construct a pump since I wasn’t … More Lift Pump
Tajikistan was my first project with Hydromissions. I was a Trainee with responsibility to run the operation in country with Steve and Jen close by as my mentors/instructors. Steve & Jen reminded me in the beginning of the trip that every project is different and they specifically prayed that the challenges I would face would … More Drilling in Tajikistan